---
title: East Lake Elementary School
description: East Lake Elementary School
---

[Projects | Thompson Turner Construction ](https://turner.thompsonconstructiongroup.com/about-us/projects)

# [East Lake Elementary School](https://turner.thompsonconstructiongroup.com/about-us/projects/east-lake-elementary-school)

 Written by [Thompson Construction](https://turner.thompsonconstructiongroup.com/about-us/projects/author/thompson-construction) | Jun 10, 2025 8:33:42 PM

Thompson Turner Construction delivered the new 110,000 SF East Lake Elementary School via CM At-Risk in Holly Hill, SC, for the Orangeburg County School District. As the first new elementary school built in eastern Orangeburg County in over 70 years, this two-story facility represents a generational investment in public education, consolidating students from Holly Hill, St. James Gaillard, and Vance Providence elementary schools into one modern, future-ready campus designed to serve up to 700 students in grades Pre-K through 5.

The building features flexible, state-of-the-art learning environments that support both current academic programming and future growth. Classrooms are equipped with full-sized refrigerators and are complemented by collaborative teacher suites with private restrooms and kitchenettes. Dedicated STEM labs, a large gymnasium, outdoor patios, and turf playgrounds provide students with enriched educational and recreational opportunities.

Engineered for long-term durability and operational efficiency, the facility is built on a steel structure and incorporates energy-efficient mechanical, electrical, and plumbing systems. Durable finishes and low-maintenance materials were selected to reduce lifecycle costs and support sustainable building performance.

Extensive site development included the demolition of the former Holly Hill Elementary School to allow for a new student drop-off loop and expanded parking. Additional infrastructure improvements included a new bus loop, designated teacher parking, and upgraded stormwater systems to enhance traffic flow, safety, and drainage across the campus.

[View full post](https://turner.thompsonconstructiongroup.com/about-us/projects/east-lake-elementary-school)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Thompson Construction"
  },
  "dateModified" : "2025-06-10T20:33:42.510Z",
  "datePublished" : "2025-06-10T20:33:42Z",
  "headline" : "East Lake Elementary School",
  "image" : {
    "@type" : "ImageObject",
    "height" : 1124,
    "url" : "https://5108882.fs1.hubspotusercontent-na1.net/hubfs/5108882/BHP250419DJI_0074a.jpg",
    "width" : 2000
  },
  "mainEntityOfPage" : "https://turner.thompsonconstructiongroup.com/about-us/projects/east-lake-elementary-school",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Projects | Thompson Turner Construction"
  }
}
```