Caterpillar Hydraulic Plant
Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...
As A&R Bulk Pak business grew, more space to handle materials from customers for repackaging to shipping was necessary. Thompson Turner Construction worked closely with the owner to develop the scope of work and make adjustments in order to ensure that the Phase 2 expansion was well-suited for the growing operation.
The scope of work included attaching the new facility to the existing space and creating 75,000 SF of packaging and warehousing space.
A new electrical service to the building was also included to create a better power system for the addition. Thompson Turner was also awarded the final phase three of this addition, which was an additional 80,000 SF, for a project total of 155,000 SF.
About the Project
Owner
A&R Bulk Pak, LLC
Cost
$4M
Architect
Red Iron Architects
Phase
Completed
Size
155,000 SF
Type of Construction
Design-Build
Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...
As A&R Bulk Pak business grew, more space to handle materials from customers for repackaging to shipping was necessary....
Thompson Turner Construction was hired by King Machine to expand their operations within their recently constructed...