Caterpillar Hydraulic Plant

Featured Image

 

Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s existing hydraulic manufacturing plant in Sumter.

The building was constructed on conventional spread footings with steel columns, bar joists, and metal deck frame. Exterior precast wall panels are supported on continuous perimeter footing with 8” unreinforced concrete floor slabs located in the plant area.

Exterior site improvements were made and included wetlands mitigation, grading, storm drain, access roads, and parking and landscaping. This was the fastest construction delivery in Caterpillar’s history.

About the Project

Owner

Caterpillar, Inc.

Cost

$11.5M

Project Duration

March 2012 - December 2013

Type of Construction

Design-Build

L/SWMBE

10%

Projects

Other Projects that might interest you

Caterpillar Hydraulic Plant

Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...

A&R Bulk Pak Phase 2 & 3

As A&R Bulk Pak business grew, more space to handle materials from customers for repackaging to shipping was necessary....

Sumter Spec Building/ King Machine Upfit

Thompson Turner Construction was hired by King Machine to expand their operations within their recently constructed...