Caterpillar Hydraulic Plant
Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...
Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s existing hydraulic manufacturing plant in Sumter.
The building was constructed on conventional spread footings with steel columns, bar joists, and metal deck frame. Exterior precast wall panels are supported on continuous perimeter footing with 8” unreinforced concrete floor slabs located in the plant area.
Exterior site improvements were made and included wetlands mitigation, grading, storm drain, access roads, and parking and landscaping. This was the fastest construction delivery in Caterpillar’s history.
Owner
Caterpillar, Inc.
Cost
$11.5M
Project Duration
March 2012 - December 2013
Type of Construction
Design-Build
L/SWMBE
10%
Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...
As A&R Bulk Pak business grew, more space to handle materials from customers for repackaging to shipping was necessary....
Thompson Turner Construction was hired by King Machine to expand their operations within their recently constructed...