Continental Tires of the Americas, LLC desired a new building inside Continental’s facility in Sumter, SC for the new Conti Seal and Silent process. Thompson Turner Construction was hired as the construction manager and completed the project on schedule in September 2019.

The new building has all necessary production facilities and infrastructure for the complete manufacturing of commercial vehicle Seal and Silent tires. The work associated with this package included the construction a one-story building of approximately 30,500 SF which included production floor space, offices, maintenance shop, laboratory, storage, breakroom, bathrooms, and utility rooms.

On the outside it included access to an unloading and service areas. The building was compromised of only non-combustible materials. 

About the Project


Location

Sumter, SC

Type

Design Build

Market

Industrial

Completion Date

September 2019

Size

30,500 SF

Architect

Mcmillan Pazdan Smith

Projects

Other Projects That Might Interest You

Caterpillar Hydraulic Plant

Thompson Turner Construction was hired to provide design-build services for the 170,000 SF addition to Caterpillar’s...

A&R Bulk Pak Phase 2 & 3

As A&R Bulk Pak business grew, more space to handle materials from customers for repackaging to shipping was necessary....

Sumter Spec Building/ King Machine Upfit

Thompson Turner Construction was hired by King Machine to expand their operations within their recently constructed...